Powered by MOMENTUM MEDIA
australian aviation logo

Gulfstream rolls out fifth G650 for flight testing

written by australianaviation.com.au | January 28, 2011


Warning: Undefined array key "image-size-770" in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

Warning: Trying to access array offset on null in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

The fifth G650 test aircraft flies. (Gulfstream)

Gulfstream’s fifth and final Gulfstream G650 flight test aircraft took to the skies on January 24, conducting a test flight for 2 hours and 46 minutes.

The G650 (S/N 6005) took off from the Savannah/Hilton Head International Airport at 12:07 pm local time with experimental test pilots Bill Dobbs and Al Moros at the controls and flight test engineers Heather Burke and Nathaniel Rutland in the cabin. The crew evaluated the aircraft’s avionics, flight control systems and handling qualities. A maximum speed of Mach 0.94 and an altitude of 51,000ft was reached, before landing at 2:53pm local time.

This content is available exclusively to Australian Aviation members.
Login
Become a Member
To continue reading the rest of this article, please login.

or

To unlock all Australian Aviation magazine content and again unlimited access to our daily news and features, become a member today!
A monthly membership is only $5.99 or save with our annual plans.
PRINT
$49.95 for 1 year Become a Member
See benefits
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
PRINT + DIGITAL
$99.95 for 1 year Become a Member
$179.95 for 2 years Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin
DIGITAL
$5.99 Monthly Become a Member
$59.95 Annual Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin

Gulfstream senior vice president, programs, engineering and test, Pres Henne, labelled the flight as “a significant milestone in the overall certification program”, with aircraft testing “moving along at a brisk pace”.  “We’ve had four aircraft flying for some time now, so we’ve already accomplished a broad range of tests. In addition, the fatigue test article has moved to the structural-test hangar, where it will be used to evaluate the lifelong structural integrity of the aircraft,” Henne said.

Before its first flight, S/N 6005 also underwent certification ground tests for lightning and high-intensity radiated fields (HIRF) at Gulfstream’s headquarters in Savannah throughout November and December. Gulfstream reports that the lightning tests indicate the airframe and systems can withstand a severe lightning strike, while HIRF testing demonstrates the ability of the aircraft’s flight-essential systems to withstand external radio frequencies without interference.

To date, all five G650 aircraft have now surpassed 1100 hours in their flight test program and are on schedule for certification in 2011 and first deliveries in 2012.

==
==
You need to be a member to post comments. Become a member today!
Momentum Media Logo
Most Innovative Company
Copyright © 2007-2025 MOMENTUMMEDIA