Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169

Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169

Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169

Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169
Powered by MOMENTUM MEDIA
australian aviation logo

Poseidon airframe static testing complete

written by australianaviation.com.au | January 24, 2011


Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169

Warning: Undefined array key "image-size-770" in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

Warning: Trying to access array offset on null in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

P-8A flight test aircraft T3

Boeing has announced it completed full scale static testing for the P-8A Poseidon’s airframe on January 7, confirming the airframe’s structural integrity.

The series of trials, which began in May 2009, saw 154 different tests conducted on ‘S1’, the program’s full-scale static ground test vehicle, in which it sustained loads equal to or greater than those expected to occur during operational flights, with no failure of the primary structure. During 74 of the tests, the S1 airframe was subjected to 150 per cent of the highest expected flight loads. More than 4000 installed strain gages and calibrated parts captured data for analysis.

This content is available exclusively to Australian Aviation members.
Login
Become a Member
To continue reading the rest of this article, please login.

or

To unlock all Australian Aviation magazine content and again unlimited access to our daily news and features, become a member today!
A monthly membership is only $5.99 or save with our annual plans.
PRINT
$49.95 for 1 year Become a Member
See benefits
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
PRINT + DIGITAL
$99.95 for 1 year Become a Member
$179.95 for 2 years Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin
DIGITAL
$5.99 Monthly Become a Member
$59.95 Annual Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin

“The structure performed as we expected throughout testing, allowing us to efficiently expand the P-8A’s flight test envelope,” Boeing vice president and P-8 program manager Chuck Dabundo said.

The S1 airframe will be refurbished from September this year for live-fire testing at the Naval Air Warfare Center, China Lake, California. Boeing will begin fatigue tests on its second ground-test vehicle, S2, later this year.

The US Navy plans to purchase 117 P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its maritime surveillance P-3 fleet, with initial operational capability (IOC)  planned for 2013.

==
==
You need to be a member to post comments. Become a member today!
Momentum Media Logo
Most Innovative Company
Copyright © 2007-2025 MOMENTUMMEDIA