Powered by MOMENTUM MEDIA
australian aviation logo

747-8I completes initial engine runs

written by australianaviation.com.au | March 10, 2011

Warning: Undefined array key "image-size-770" in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

Warning: Trying to access array offset on null in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310
The 747-8I undergoes engine runs

Boeing has announced the successful completion of the first engine runs for its 747-8 Intercontinental, a key milestone in preparing the aircraft for first flight.

Engine runs began at 11:57 hours local time on Tuesday, lasting approximately two hours and 45 minutes. During initial engine runs, engines were started and operated at various power settings to ensure all systems perform as expected. Engine testing began with the Auxiliary Power System (APS) providing power to start the first of four General Electric GEnx-2B engines. The remaining three engines were started using the cross-bleed function.

This content is available exclusively to Australian Aviation members.
Login
Become a Member
To continue reading the rest of this article, please login.

or

To unlock all Australian Aviation magazine content and again unlimited access to our daily news and features, become a member today!
A monthly membership is only $5.99 or save with our annual plans.
PRINT
$49.95 for 1 year Become a Member
See benefits
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
PRINT + DIGITAL
$99.95 for 1 year Become a Member
$179.95 for 2 years Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin
DIGITAL
$5.99 Monthly Become a Member
$59.95 Annual Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin

Basic systems checks continued throughout the test, with all four engines powered down and inspected, after which they will be restarted following a technical review. The test team also completed a vibration check and monitored the shutdown logic to ensure each engine functioned as expected.

Boeing vice president and general manager of the 747 program, Elizabeth Lund, said that both the “integrated airplane systems and engines performed as expected”. “This result allows us to continue moving forward to first flight.”

You need to be a member to post comments. Become a member today!
Momentum Media Logo
Most Innovative Company
Copyright © 2007-2025 MOMENTUMMEDIA