Powered by MOMENTUM MEDIA
australian aviation logo

Boeing expects to reach production rate of 18 Poseidons a year in 2016

written by australianaviation.com.au | October 8, 2015

Warning: Undefined array key "image-size-770" in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

Warning: Trying to access array offset on null in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

Warning: Undefined array key "image-size-770" in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

Warning: Trying to access array offset on null in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

P-8_1Boeing expects to reach the full production rate of 18 P-8A Poseidon maritime surveillance aircraft a year in 2016 as Australia gets ready to accept the first of eight of the type on order.

Components of the RAAF’s first P-8A are already in production with the fuselage for ‘Aussie 01’ due to begin final assembly in early 2016 and the first flight expected mid-year.

This content is available exclusively to Australian Aviation members.
Login
Become a Member
To continue reading the rest of this article, please login.

or

To unlock all Australian Aviation magazine content and again unlimited access to our daily news and features, become a member today!
A monthly membership is only $5.99 or save with our annual plans.
PRINT
$49.95 for 1 year Become a Member
See benefits
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
PRINT + DIGITAL
$99.95 for 1 year Become a Member
$179.95 for 2 years Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin
DIGITAL
$5.99 Monthly Become a Member
$59.95 Annual Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin

Australia confirmed an order for eight Poseidon aircraft in February 2014 with options for four more. The first four aircraft are in various stages of pre-production while the next four have been contracted for advanced procurement, according to Boeing Military Aircraft director of business development for maritime projects James Detwiler.

“When the LOT VII contract is signed next year they will have all eight officially on contract,” Detwiler said at Pacific 2015 on Wednesday.

To date, Boeing has delivered 36 P-8s. The US Navy has received 29 P-8As while India has seven P-8Is and is due to take an eighth before the end of 2015.

The P-8A is based on the Boeing 737-800 commercial. The fuselage is built at Sprit AeroSystems as a dedicated P-8A alongside the commercial 737 fuselages in Wichita, Kansas with assembly on a specific P-8A line at Boeing’s 737 factory in Renton, Washington State. Mission and sensor systems are installed at Boeing Field, near Seattle.

As well as some design changes to cater for military operations, the P-8A features a raked wingtip rather than the blended winglet seen on the 737 to integrate de-icing on the leading edge all the way to the tip to combat cold weather conditions during anti-submarine warfare operations.

Commonality with the commercial Boeing 737 extends to training as well as the sourcing of spare parts – P-8A pilots first obtain a commercial type rating for the 737 and then go through a “differences training” course that lasts for a few weeks.

“As various international potential customers look at commercial synergies with an installed base of commercial 737 Next Gen commercial aircraft, they realise there are tremendous savings opportunities.” Detwiler said.

JD_detwiler-1
Boeing’s JD Detwiler at Pacific 2015 on Wednesday.

“This aircraft has such a low cost per hour and with the common spares pool for those high-use items such as wheels and brakes, those are all commercial common. That was designed into the aircraft. It is the same thing with the powerplant. The GE-CFM56 engine core is identical to the other 8,000 or so engines in commercial service today so today there’s a huge sparing pool and parts pool that they can tap into.”

On Boeing’s expectation that it will achieve its full production rate of 18 aircraft in 2016, he explained: “Every other month we will deliver two aircraft to make that 18. We are somewhere in the transition between 12 and 18 at the moment.”

Detwiler says figures from the US Navy show the program has achieved US$2.1 billion in savings through production efficiencies and the steady ramp up in production.

“We’ve drastically reduced our production times, learning curves and that sort of thing.”

You need to be a member to post comments. Become a member today!

Comments (4)

  • Corey

    says:

    I can’t wait to see these aircraft in the RAAF fleet and I hope that the Government and RAAF will buy the 4 optional aircraft plus more if needed. I’ll also like to add that I hope the USAF proceed with a new JOINT Starts platform based on the 737/P-8 and that Australia buys a small fleet. The training for the aircraft will be very minimal due to the E-7A and BBJs we currently have in the fleet as well.

  • Chester

    says:

    Congratulations Corey, that is a remarkably restrained comment coming from you 🙂

  • Raymond

    says:

    Haha, I was thinking the same thing Chester!

    Nice to see a sensible comment from you Corey!

    Somehow I cannot imagine the RAAF procuring a fleet of these or that it’d be a priority. The E-7 and P-8 fleets would probably cover what Australia needs in this regard.

    I’d be surprised if the optional four P-8’s weren’t taken up and I think we’ll see these ordered in time.

  • TimC69

    says:

    I agree , we take up the additional four options and maybe look at an additional Wedgetail or two.

Comments are closed.

Momentum Media Logo
Most Innovative Company
Copyright © 2007-2025 MOMENTUMMEDIA