Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169
Warning: Undefined array key "image-size-770" in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310
Warning: Trying to access array offset on null in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310
Sikorsky has successfully powered up the new engines and rotor head of the new CH-53K helicopter on its ground test vehicle (GTV) development airframe. Called ‘bare head light-off’ testing because it is conducted without rotor blades being attached to the head, the test validated the aircraft’s dynamic components.
“GTV main engines powered ‘on’ is a significant step for the CH-53K helicopter program,” Mike Torok, Sikorsky’s CH-53K program VP said. “Having independently tested the aircraft’s many components and subsystems, including electrical and avionics, hydraulics and flight controls, landing gear, propulsion, transmissions and rotors, now we have begun testing these critical functions as an entire system powered by the GTV aircraft’s three GE 7,500shp class engines.”
This content is available exclusively to Australian Aviation members.
A monthly membership is only $5.99 or save with our annual plans.
- Australian Aviation quarterly print & digital magazines
- Access to In Focus reports every month on our website
- Unlimited access to all Australian Aviation digital content
- Access to the Australian Aviation app
- Australian Aviation quarterly print & digital magazines
- Access to In Focus reports every month on our website
- Access to our Behind the Lens photo galleries and other exclusive content
- Daily news updates via our email bulletin
- Unlimited access to all Australian Aviation digital content
- Access to the Australian Aviation app
- Australian Aviation quarterly print & digital magazines
- Access to In Focus reports every month on our website
- Access to our Behind the Lens photo galleries and other exclusive content
- Daily news updates via our email bulletin
Essentially a scaled-up re-design of the CH-53E Super Stallion, the 40-tonne CH-53K will be able to carry triple the weight of the current CH-53E, and will be the largest helicopter in the US when it enters service with the USMC in 2018. The USMC has a requirement for up to 200 CH-53Ks to replace the CH-53E.
Ben
says:This is what the RAN should acquire to provide greater lift than the MRH90’s. Far greater capability in an amphibious or counter disaster situation.