Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169

Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169

Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169

Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169
Powered by MOMENTUM MEDIA
australian aviation logo

Tower, ILS upgrades for Melbourne

written by australianaviation.com.au | March 31, 2010

Warning: Attempt to read property "name" on false in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/plugins/momentummedia-article-gate/includes/class-momentummedia-article-gate.php on line 169

Warning: Undefined array key "image-size-770" in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310

Warning: Trying to access array offset on null in /data/www/upgrade/australianaviation.com.au/httpdocs/wp-content/themes/australianaviation/functions.php on line 1310
A view from the west of Melbourne's existing (left) and soon to be built ATC towers. (Airservices)
A view from the west of Melbourne's existing (left) and soon to be built ATC towers. (Airservices)

Airservices Australia and Melbourne Airport have launched the construction of a new air traffic control tower and technical services centre, while the airport has also commissioned Australia’s first Category 3 instrument landing system (ILS).

Construction of the $17 million, 78m high new control tower is expected to begin immediately, and it will be built adjacent to the existing tower. It will feature state-of-the-art technology and will be ready for service in 2012. Airservices is also establishing a new Air Traffic Services Centre at the airport which will be completed by 2011 to house engineers, technicians and equipment.

This content is available exclusively to Australian Aviation members.
Login
Become a Member
To continue reading the rest of this article, please login.

or

To unlock all Australian Aviation magazine content and again unlimited access to our daily news and features, become a member today!
A monthly membership is only $5.99 or save with our annual plans.
PRINT
$49.95 for 1 year Become a Member
See benefits
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
PRINT + DIGITAL
$99.95 for 1 year Become a Member
$179.95 for 2 years Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin
DIGITAL
$5.99 Monthly Become a Member
$59.95 Annual Become a Member
See benefits
  • Unlimited access to all Australian Aviation digital content
  • Access to the Australian Aviation app
  • Australian Aviation quarterly print & digital magazines
  • Access to In Focus reports every month on our website
  • Access to our Behind the Lens photo galleries and other exclusive content
  • Daily news updates via our email bulletin

The Cat 3 ILS system meanwhile will allow a number of aircraft to land in foggy conditions at the airport where visibility is down to as low as 75 metres, down from at least 800m previously. It is supported by other improvements including a laser-based runway visual range system to measure fog density, improved taxiway lighting for low visibility conditions, and the introduction of runway ‘stop bars’ to control aircraft movements and enhance safety.

“We invested over $10 million in additional infrastructure,” said Melbourne Airport’s executive general manager Simon Gandy. “The entire project practically ensures a 100 per cent arrival and departure capability in foggy conditions for all approved operators. This whole-of-industry initiative is fantastic for the state and testament to the partnership between Airservices Australia, airlines and airport operator.”

You need to be a member to post comments. Become a member today!
Momentum Media Logo
Most Innovative Company
Copyright © 2007-2025 MOMENTUMMEDIA